1 |
Out of total cultivated area of wheat, rain-fed area in percentage is: |
- A. 17 percent
- B. 10percent
- C. 20percent
- D. 30percent
|
2 |
During 2000-01, installed capacity of hydel power was: |
- A. 4,963 Mw
- B. 5,500 Mw
- C. 6,200 Mw
- D. 4,500 Mw
|
3 |
Whichprovince yields highest per hectare wheat in Pakistan ? |
- A. Punjabprovince
- B. KPKprovince
- C. Sindhprovince
- D. Baluchistanprovince
|
4 |
At the time of inception of Pakistan; installed capacity of thermal electricity was: |
- A. 68,800 Kv
- B. 70,000 Kv
- C. 1,25,000 Kv
- D. 2.5 lakh Kv
|
5 |
Out of total wheat cultivated area irrigation is done over: |
- A. 83 percent
- B. 50percent
- C. 70percent
- D. 90percent
|
6 |
In Pakistan, first nuclear power station was established at: |
- A. Karachi
- B. Hyderabad
- C. Multan
- D. Faisalabad
|
7 |
Pakistan's largest hydro electricity project is: |
- A. Tarbela
- B. Mangla
- C. Warsak
- D. Malakand
|
8 |
Out of total, cultivation area, wheat is cultivated over: |
- A. 40 percent area
- B. A very nominal area
- C. Very huge area
- D. An enough area
|
9 |
During 2000-01, WAPDA'S installed capacity of thermal power was: |
- A. 9,884 MW
- B. 10,000 MW
- C. 5,750 MW
- D. 7,500 MW
|
10 |
In the world, with the help of mineral resources of energy: |
- A. About 75 percent electricity is produced
- B. About 50 percent electricity is produced
- C. Electricity production is not possible
- D. In huge amount electricity is produced
|