1 |
When the Indus Water Treaty was signed? |
19th September 1960
19th September 1952
19th December 1975
None of these
|
2 |
What is the installed capacity of Chashma Nuclear Plant? |
3.20 MW
32.8 MW
325 MW
None of these
|
3 |
Diamer Bhasha dam will produce electricity after completing |
4200 MW
4500 MW
4800 MW
6000 MW
|
4 |
Upper Chenab Canal takes off from |
Head Sulaimanki
Head Marala
Head Khanki
None of these
|
5 |
The Chashma Nuclear plant was built with the help of |
France
Germany
Canada
China
|
6 |
Producing capacity of electricity of Ghazi Barotha Dam is |
1850 MW
1750 MW
1925 MW
1450 MW
|
7 |
Hangol Dam is located in |
Sindh
FATA
Baluchistan
PK
|
8 |
Balloki Head works was built on the river |
Ravi
Sutlej
Bias
Jhelum
|
9 |
Under Indus Water Treaty the rivers given to Pakistan are |
Indus Jhelum and Chenab
Indus and Jhelum
Ravi and Beas
None of these
|
10 |
Under Indus Water Treaty which rivers were given to India? |
Ravi and Beas
Indus, Jhelum and Chenab
Sutlej, Ravi and Beas
None of these
|