1 |
Which dam is 103 km from Rawalpindi?This dam was completed in 1976 at a cost of Rs.18.5 billion having a capacity of generating 3.478 MW of electricity. Its reservoir is 97 km long with a depth of 137 meters while total area of the lake is 200 sq km? |
Tarbela Dam
Mangla Dam
Munda Dam
Warsak Dam
|
2 |
Tanaza Dam is a small dam located at about 35 km south-west of |
Rawalpindi
Quetta
Skardu
Gilgit
|
3 |
Misriot dam is located 12 km south-west of |
Rawalpindi
Quetta
Skardu
Gilgit
|
4 |
Diamer-Bhasha Dam has been planned in the Northern Areas of Pakistan on the River of |
Chenab
Jhelum
Ravi
Indus river
|
5 |
What will be the height of Diamer-Bhasha Dam after completion? |
170 ft
270 ft
370 ft
470 ft
|
6 |
Tarbela Dam is a large dam on the Indus River in Pakistan A reservoir size of 95 square miles (250 km2) makes it the largest earth filled filled dam in the world.The dam was completed in |
1973
1972
1974
1976
|
7 |
The power station of mangla dam consists of 10 units each having capacity of |
100 MW
200 MW
300 MW
400 MW
|
8 |
The Mangla Dam is the twelfth largest dam in the world.It was constructed in 1967 across the Jhelum River in which district? |
Mirpur district
Ghazipur
Islamabad
Jhelum
|
9 |
Which dam was damaged partially during an Indian Air Force bombing in the Indo-Pakistan War of 1971 when the hydro project was hit by the bombs? |
Tarbela
Mangla Dam
Hub
None of these
|
10 |
The origin of Upper Bari Doab Canal is |
Chenab
Jhelum
Ravi
None of these
|