1 |
Mirani Dam is located in Gwadar District on Dasht River of |
KPK
Sindh
Balochistan
Punjab
|
2 |
Khanpur Dam was built in 1983 on the Haro River near the town of Khanpur of ____. about 25 miles (40 km) from Islamabad |
KPK
Sindh
Balochistan
Punjab
|
3 |
The Nai Gaj Dam is located on Nai Gaj river at the terminal Bridge of Kirthar Range and lies in District of |
Dadu
Thatha
Nawab Shah
Hyderabad
|
4 |
Which Dam project is a largest hydropower project in private sector and first dam in private sector? |
Nai Gaj Dam
Mangla Dam
Hub Dam
Munda Dam
|
5 |
Munda Dam and Kurram Tangi multipurpose projects to provide irrigation facilities to thousands acres of land and to generate 723 MW power. These dams are located in |
KPK
Sindh
Balochistan
Punjab
|
6 |
The Basha Dam on Indus River is being constructed in: |
PK
Northern Areas
Punjab
None of these
|
7 |
Sulemanki Head works is constructed on the river |
River Ravi
River Chenab
River Setluj
None of these
|
8 |
What is the installed hydroelectricity generation capacity of Tarbela? |
3478 MW
3378 MW
3578 MW
3278 MW
|
9 |
Marala Head works has been constructed on River: |
Ravi
Chenab
Sutlej
Indus
|
10 |
Akhori Dam (122 meters (400 Ft) Height dnd 5.16 Km (3.23 Miles) Lengths) is located in Nandnakas near Akhori village in which district of Punjab |
Jhelum
Attock
Chakwal
Sialkot
|