1 |
Temporary storage areas within the CPU are called |
ROMs
Registers
Accumulators
Address
|
2 |
Implementation of a program involves |
Compilation of the program
Debugging the program
Testing the program with data
All of the above
|
3 |
A conceptual error in a program is a/an |
Logical error
Execution error
Syntactical error
None of the above
|
4 |
Program maintenance means |
Maintaining a program exactly the way it was initially developed
Changing a program due to changes in the organization
Removing the errors from a program
Changing a program due to changes in the organization
|
5 |
An A/D converter does the conversion from |
Digital to analog
Analog to digital
Voltage to ampere
Direct to alternate current
|
6 |
A bootstrap is. |
the flat cable that connects the CPU to the printer
the flat cable from the disk controller card to the disk drive
additional memory device
a small initialization program to start up the computer
|
7 |
Point of sale terminal to. |
Terminals associated with MICR
Smart terminal
Terminal associated with OCR
None of above
|
8 |
In time division Multiplexing. |
Time is doubled between bits of a byte
Time slicing at CPU level takes place
Total time available in the channel is divided between users and each user is allotted a time slice
None of above
|
9 |
Which of the following is not a component of telecommunications? |
sender
office device
medium
receiver
|
10 |
Rearranging data in a new sequence is known as. |
Updating
Batching
Sorting
Summarising
|
11 |
If a processor does not have direct and unassisted access to data items, these items are said to be. |
off line
Time Shared
on line
None of these
|
12 |
The widely used code in data communication is. |
a bit ASCII
7 bit ASCII
EBCDIC
none of these
|
13 |
Assuming 8 bit for data, 1 bit for parity, 1 start bit and 2 stop bits, the number of characters that 1200 BPS communication line can transmit. |
10 CPS
120 CPS
12 CPS
none of these
|
14 |
Tool to change PROM chips are called. |
chip kits
RAM burners
PROM burner
none of these
|
15 |
An emerging technology that provides nonvolatile memory chips is. |
flash memory
PROM
CMOS
CISC
|
16 |
When the control unit directs the ALU to perform an operation on the data, the machine cycle is involved in its. |
first step
third step
second step
fourth step
|
17 |
One Megabyte is equivalent to. |
2<sup>10</sup>bytes
2<sup>20</sup>bytes
2<sup>30</sup>bytes
none of these
|
18 |
An organic chip is called a. |
storage chip
biochip
microchip
silicon chip
|
19 |
The person who requests study or work on a system is the. |
client
analyst
change agent
user
|
20 |
Turning an entire project over to an outside firm for development is called. |
auditing
outsourcing
preliminary investigation
prototype
|
21 |
Scheduling deadlines and milestones can be shown on a. |
system survey
decision table
prototype
Gantt chart
|
22 |
The phase following detail design is, |
preliminary investigation
implementation
system development
system conversion
|
23 |
Use to ensure that no alternative is overlooked during data analysis. |
data flow diagram
organization chart
Gantt chart
decision table
|
24 |
A systems analyst would observe the flow of data and interrelations of people within an organization during. |
detail design
preliminary design
systems analysis
a system survey
|
25 |
The entire new system is used by a portion of the users. |
direct conversion
pilot conversion
file conversion
parallel conversion
|
26 |
The kind of interview where all questions are planned in advance is called |
preplanned
structured
observation
unstructutred
|
27 |
Data gathering and data analysis take place. |
after the system survey
after system analysis
during system design
during evaluation
|
28 |
Programming and testing are elements of. |
system analysis
system development
implementation
system design
|
29 |
Positioning of headings and columns for the report format, considered during system design, might use. |
a record layout an organization chart
a decision table
a printer spacing chart
a printer spacing analysis
|
30 |
In the course of a systems project, systems design |
follows systems analysis
follows development
precedes systems analysis
is the fourth phase
|